Obtaining Codes / Regulations
Permit Procedures / Requirments
Permit Fees
Utility Rates
UTILITY RATES
 


Click on a link below to view the information for that category
  ELECTRIC RATE SCHEDULES
 
  RECLAIMED WATER RATE SCHEDULES
  SOLID WASTE RATE SCHEDULES
  HIGH TEMPERATURE HOT WATER RATE SCHEDULE
  CHILLED WATER RATE SCHEDULES
  POTABLE WATER RATE SCHEDULES
  GAS RATE SCHEDULES
  SCHEDULE OF CONNECTION CHARGES
 

ELECTRIC RATE SCHEDULES
Effective October 4, 2009

       
RATE SCHEDULE RS (RESIDENTIAL SERVICE)
Rate per month    
Customer Facilities Charge    
  per month   $2.85
Energy Charge    
  cents per kwh   6.414
Fuel Charge    
  cents per kwh   5.687
       
RATE SCHEDULE GS (GENERAL SERVICE)
Rate per month    
Customer Facilities Charge    
  per month   $2.85
Energy Charge    
  cents per kwh   11.007
Fuel Charge    
  cents per kwh   5.687
       
RATE SCHEDULE GSD (GENERAL SERVICE DEMAND)
Rate per month    
Customer Facilities Charge    
  per month   $20.00
Demand Charge    
  per kw demand   $11.712
Energy Charge    
  cents per kwh   2.911
Fuel Charge    
  cents per kwh   5.687
       

SEWER RATE SCHEDULES
Effective October 4, 2009
       
SC-1: METERED DOMESTIC WATER    
per month-per 1,000 Gallons
(unreturned domestic water may be excluded pursuant to Section 3.03 (b) (3) of the Potable Water Service Rules and Regulations)
  $5.90
All unmetered areas as follows:      
SC-2: TRAILERS    
per month, per unit     $46.09
SC-3: THEATERS      
per month, per seat     $ .948
SR-1: MONTHLY RATE FOR RESIDENTIAL SEWER SERVICE
Each active residential account shall be billed on the basis of a two-part rate consisting of a customer charge and a volumetric charge based on metered water usage during the billing period.
Monthly Customer Charge     $ 3.29
Volumetric Charge for Metered Water - Usage per 1,000 Gallons    
H02 Wholesale Sewer - 109     $ 2.65
H02 Wholesale Sewer - 114     $ 3.17
       
The minimum monthly charge shall be the customer charge.
       
The maximium monthly sewer service charges for residential customers, receiving potable water service through a 5/8 x 3/4 inch or 1 inch meter shall not exceed an amount computed on the basis of 8,000 gallons of metered water usage plus the monthly customer charge.

RECLAIMED WATER RATE SCHEDULES
Effective October 4, 2009
       
RATE SCHEDULE GS-1 (GENERAL SERVICE)
Consumption Rate-Based upon water used per meter, per month, and shall be in addition to the monthly readiness-to-serve rate.
Consumption Charge      
Cents per 1,000 Gallons     90.72
       
Readiness To Serve Rate Based upon meter size, per month, and shall be in addition to the monthly consumption charge.
       
  METER SIZE    
  5/8"   $21.77
  3/4"   $21.77
  1"   $54.54
  1.5"   $109.33
  2"   $174.72
  3"   $349.33
  4"   $545.87
  6"   $1,091.62
  8"   $1,746.62
  10"   $2,510.78

SOLID WASTE RATE SCHEDULES
Effective October 4, 2009
   
    BASE CHARGE PER PICKUP TONNAGE RATE
RATE SCHEDULES FOR FRONT END LOADERS    
FE-1: 10 cu yd compactor $45.59 N/A
FE-2: 5 cu yd compactor $51.52 N/A
FE-3: 8 cu yd box $27.15 N/A
FE-4: 6 cu yd box $24.09 N/A
       
RATE SCHEDULES FOR ROLL-OFF CLASS I (1)    
RO1: 40 cu yd compactor $243.59 $67.91
RO2: 30 cu yd compactor $243.59 $67.91
RO10: 20 cu yd box (class I) $243.59 $67.91
RO11: 30 cu yd box (class I) $243.59 $67.91
       
RATE SCHEDULES FOR ROLL-OFF CLASS III (2)    
RO6: 30 cu yd box (landscape) $285.17 N/A
RO7: 20 cu yd box (landscape) $285.17 N/A
RO12: 20 cu yd box (class III) $285.17 N/A
RO13: 20 cu yd box (C&D) $223.85  N/A 
RO-M: 20 cu yd box (Manure) $243.59 N/A
     
RATE SCHEDULES FOR TIRE DISPOSAL    
RO-9: 20 cu yd box (tire disposal) $842.36 N/A
       
RATE SCHEDULES FOR MINI PACKERS    
MP-2: 15 cu yd truck $14.63 $71.86
       
       
SURCHARGE RATES    
SC2: Rejected recyclable container surcharge (8 cu yd box)   $27.15
SC3: Rejected recyclable container surcharge (20 cu yd box)   $243.59
ROB Wood Box Pickup   No Charge
       
(1) Class I material constitutes sanitary landfill wastes (household and kitchen waste and refuse) excluding hazardous and regulated wastes.
       
(2) Class III material constitutes generated construction debris and yard waste excluding hazardous, regulated and sanitary landfill wastes.

HIGH TEMPERATURE HOT WATER RATE SCHEDULE
Effective October 4, 2009
       
RATE SCHEDULE HTHW
Consumption Charge    

Per MMBTU   $25.11
       
LOW TEMPERATURE HOT WATER RATE SCHEDULE
Effective October 4, 2009
       
RATE SCHEDULE LTHW
Consumption Charge    
Per MMBTU   $21.27
CHILLED WATER RATE SCHEDULES
Effective October 4, 2009
       
RATE SCHEDULE CW-1
Consumption Charge    
Per Ton Hour   $.1560
       
RATE SCHEDULE CW-2
Consumption Charge    
Per Ton Hour   $.1600
     
RATE SCHEDULE CW-3
Consumption Charge    
Per Ton Hour   $.1692
     
RATE SCHEDULE CW-4
Chill Water Standby $2,000.00 $.1560
       

POTABLE WATER RATE SCHEDULES
Effective October 4, 2009
       
RATE SCHEDULE GS-1 (GENERAL SERVICE)
Consumption Rate-Based upon water used per meter, per month, and shall be in addition to the monthly readiness-to-serve rate.
Consumption Charge      
Cents per 1,000 Gallons     117.30
       
Readiness To Serve Rate Based upon meter size, per month, and shall be in addition to the monthly consumption charge.
       
  METER SIZE    
  5/8"   $27.02
  3/4"   $27.02
  1"   $67.60
  1.5"   $135.21
  2"   $216.43
  3"   $432.87
  4"   $676.49
  6"   $1,352.95
  8"   $2,164.66
  10"   $3,111.58
RATE SCHEDULE GS-2
Consumption Rate-Based on water metered at all wells in Sub-district 1    
Consumption Charge      
cents per 1,000 Gallons     157.00
RATE SCHEDULE GS-3
(UNMETERED TO TRAILERS)
 
   
Rate per month, per unit     $12.45
       
INTERLOCAL AGREEMENT
WHOLESALE WATER - 106
  $.50
 

GAS RATE SCHEDULES
Effective October 4, 2009

       
RATE SCHEDULE RS (RESIDENTIAL SERVICE)
     
Non Fuel Energy Charge    
  Per Therm   $.2060
Cost of Purchased Gas    
  Per Therm   $.7363
Minimum Bill    
  Per Month   $5.00

RATE SCHEDULE GS (GENERAL SERVICE)
     
Non Fuel Energy Charge    
  Per Therm   $.2060
Cost of Purchased Gas    
  Per Therm   $.7363
Minimum Bill    
  Per Month   $5.00
       
       

SCHEDULE OF CONNECTION CHARGES
The following connection charges shall apply to all applications for water service:
Customer Classification Plant Capacity Charge

Hotels / Motels

All Other Facilities

$183 per room

$183 minimum for any facility that would use more than 500 gallon per day. The charge will be at the rate of 36.6 cents per gallon per day as determined by peak daily demand.


The following connection charges shall apply to all applications for sewer service:
Customer Classification Connection Charges

Hotel and Motel
Apartment / Time Shares
Single Residence
Commercial and Industrial
Restaurant and Cafeteria
Recreational Vehicle Park
Camping Area with Community Sanitary Facilities

Construction Camps and Other Trailer Courts

$100 per room
$200 per unit
$400 per unit
$20 per 1000 square feet
$20 per seat
$60 per space

$150 per acre or fractional acre thereof

$60 per space
 



Additional Information
Application for Permit




 
 
 
Under Florida law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public record request, do not send electronic mail to this entity. Instead contact this office by phone or in writing. (F.S. 668.6076)

Copyright © 2004-05 Reedy Creek Improvement District • All Rights Reserved