Effective September 20, 2021
RATE SCHEDULE RS (RESIDENTIAL SERVICE)
Rate per month
Customer Facilities Charge
per month $2.85
Energy Charge
per kwh $0.08122
Fuel Charge
per kwh $0.01966

RATE SCHEDULE GS (GENERAL SERVICE)
Rate per month
Customer Facilities Charge
per month $2.85
Energy Charge
per kwh $0.12951
Fuel Charge
per kwh $0.01966

RATE SCHEDULE GSD (GENERAL SERVICE DEMAND)
Rate per month
Customer Facilities Charge
per month $20.00
Demand Charge
per kw demand $7.220
Energy Charge
per kwh $0.04849
Fuel Charge
per kwh $0.01966


Effective September 20, 2021
SC-1: METERED DOMESTIC WATER
per month-per 1,000 Gallons
(unreturned domestic water may be excluded pursuant to Section 3.03 (b) (3) of the Potable Water Service Rules and Regulations) $5.91
All unmetered areas as follows:
SC-2: TRAILERS
per month, per unit $46.08
SC-3: THEATERS
per month, per seat $0.948
SR-1: MONTHLY RATE FOR RESIDENTIAL SEWER SERVICE
Each active residential account shall be billed on the basis of a two-part rate consisting of a customer charge and a volumetric charge based on metered water usage during the billing period.
Monthly Customer Charge $3.28
Volumetric Charge for Metered Water – Usage per 1,000 Gallons $ 4.49
The minimum monthly charge shall be the customer charge.
The maximum monthly sewer service charges for residential customers, receiving potable water service through a 5/8 x 3/4 inch or 1 inch meter shall not exceed an amount computed on the basis of 8,000 gallons of metered water usage plus the monthly customer charge.
H02 Wholesale Sewer – 109 $2.61
H03 Wholesale Sewer – 114 $ 2.64


Effective September 20, 2021
RATE SCHEDULE GS-1 (GENERAL SERVICE)
Consumption Rate-Based upon water used per meter, per month, and shall be in addition to the monthly readiness-to-serve rate.
Consumption Charge
Cents per 1,000 Gallons $0.8332
Readiness To Serve Rate Based upon meter size, per month, and shall be in addition to the monthly consumption charge.
METER SIZE
5/8″ $20.05
3/4″ $20.05
1″ $50.27
1.5″ $100.74
2″ $161.00
3″ $321.90
4″ $503.01
6″ $1005.83
8″ $1,609.46
10″ $2,313.59
RATE SCHEDULE GS-2 (UNMETERED TO TRAILERS)
per month, per unit $11.46



Effective September 20, 2021

RATE SCHEDULES FOR FRONT END LOADERS

BASE CHARGE PER PICKUP TONNAGE RATE
FE-1: 10 cu yd compactor $59.98 N/A
FE-2: 5 cu yd compactor $67.79 N/A
FE-3: 8 cu yd box $35.73 N/A
FE-4: 6 cu yd box $31.69 N/A

RATE SCHEDULES FOR ROLL-OFF CLASS I (1)

BASE CHARGE PER PICKUP TONNAGE RATE
RO1: 40 cu yd compactor $292.25 $91.17
RO2: 30 cu yd compactor $292.25 $91.17
RO10: 20 cu yd box (class I) $292.25 $91.17
RO11: 30 cu yd box (class I) $292.25 $91.17

RATE SCHEDULES FOR ROLL-OFF CLASS III (2)

BASE CHARGE PER PICKUP TONNAGE RATE
RO6: 30 cu yd box (landscape) $375.16  N/A
RO7: 20 cu yd box (landscape) $375.16 N/A
RO8: 20 cu yd box (construction) $367.84 N/A
RO12: 20 cu yd box (class III) $375.16 N/A
RO20: 20 cu yd box $320.47 N/A

RATE SCHEDULES FOR TIRE DISPOSAL

BASE CHARGE PER PICKUP TONNAGE RATE
RO-9: 20 cu yd box (tire disposal) $1108.21 N/A

RATE SCHEDULES FOR MINI PACKERS

BASE CHARGE PER PICKUP TONNAGE RATE
MP-2: 15 cu yd truck $19.25 $91.88

SURCHARGE RATES

BASE CHARGE PER TONNAGE RATE
SC2: Rejected recyclable container surcharge
(8 cu yd box)
$35.73
SC3: Rejected recyclable container surcharge
(20 cu yd box)
$320.47
ROB Wood Box Pickup No Charge

(1) Class I material constitutes sanitary landfill wastes (household and kitchen waste and refuse) excluding hazardous and regulated wastes.
(2) Class III material constitutes generated construction debris and yard waste excluding hazardous, regulated and sanitary landfill wastes.



Effective September 20, 2021
RATE SCHEDULE HTHW
Consumption Charge: Per MMBTU $18.74


Effective September 20, 2021
RATE SCHEDULE LTHW
Consumption Charge: Per MMBTU $15.79


Effective September 20, 2021
RATE SCHEDULE CW-1 (CEP)

  • Consumption Charge: Per Ton Hour $.1395

RATE SCHEDULE CW-2 (ECEP)

  • Consumption Charge: Per Ton Hour $.1444

RATE SCHEDULE CW-3 (Studio)

  • Consumption Charge: Per Ton Hour $.1553

RATE SCHEDULE CW-4

  • Chill Water Standby $2,000.00 $.148

Effective September 20, 2021
RATE SCHEDULE GS-1 (GENERAL SERVICE)

  • Consumption Rate-Based upon water used per meter, per month, and shall be in addition to the monthly readiness-to-serve charge.
  • Consumption Charge: per 1,000 Gallons $1.0571
  • Readiness To Serve Rate Based upon meter size, per month, and shall be in addition to the monthly consumption charge.

METER SIZE

  • 5/8″ $24.34
  • 3/4″ $24.34
  • 1″ $60.91
  • 1.5″ $121.84
  • 2″ $195.03
  • 3″ $390.08
  • 4″ $609.60
  • 6″ $1,219.19
  • 8″ $1,950.66
  • 10″ $2,803.97

RATE SCHEDULE GS-2
Consumption Rate-Based on water metered at all wells in Sub-district 1

  • Consumption Charge: per 1,000 Gallons $1.4149

RATE SCHEDULE GS-3 (UNMETERED TO TRAILERS)

  • Rate per month, per unit $11.21

INTERLOCAL AGREEMENT

  • WHOLESALE WATER – 106 $.50

Effective September 20, 2021
RATE SCHEDULE RS (RESIDENTIAL SERVICE)

  • Non Fuel Energy Charge: Per Therm $.3565
  • Cost of Purchased Gas: Per Therm $.3479
  • Minimum Bill: Per Month $5.00

RATE SCHEDULE GS (GENERAL SERVICE)

  • Non Fuel Energy Charge: Per Therm $.3565
  • Cost of Purchased Gas: Per Therm $.3479
  • Minimum Bill: Per Month $5.00

A connection charge of $500.00 shall apply to all applications for service for Electric, Potable Water, Reclaimed Water, Natural Gas and Conditioned Water services provided by the District.